
SEZO · Steel halls
Steel halls and metal structures
We design, fabricate and install steel halls for warehouses, production, service centres and agriculture. From the bare frame to a complete building with cladding, doors and windows.
- Warranty on all work
- Free measurement
- Reply within 24 h
Custom steel halls, from measurement to installation
We build halls from portal frames spaced 5 to 6 m apart, with purlins, bracing and anchors. Your contractor builds the concrete foundations to our plan. We fabricate all elements in the workshop, apply corrosion protection, and install them on site with a crane.
We clad with sandwich panels (walls and roof) or trapezoidal sheet for agricultural buildings. We fit industrial sectional doors, pedestrian doors, windows and skylights.
- Free site visit and measurement
- Made in our own workshop in Novi Pazar
- Installation throughout Serbia
- Warranty on all work
How much it costs
Price ranges
Prices include materials, fabrication, corrosion protection and installation. You get an exact price after a free measurement, or instantly for your dimensions in the 3D configurator.
Calculate for my size All pricesProjects
Steel halls: our work
Prefabricated panel buildingSteel frame and cladding
Canopy along a steel hallTruss girders and sheeting along the facade
Sandwich panel annexExtension to a house
Steel hall structurePortal frames, on-site installation
WarehouseSandwich panels and skylights
Fabricating girders in the hallWelding lattice trusses
How we work
How we work
- 01
Design and send
In 3D you choose the design, colour and size and see a price estimate. Or simply tell us what you need.
- 02
Free measurement
We come to your site, measure and give you an exact quote with price and timeline. No obligation.
- 03
Fabrication and installation
We fabricate in our own workshop and install on the agreed date. All work comes with a warranty.
Reviews
What our clients say
FAQ
Do you do the design?
Yes, with our partners we do the structural calculations and the construction design.
How long does it take to build a hall?
For a hall up to 500 m², fabricating and erecting the structure takes about 4 to 8 weeks, depending on the cladding.
Free quote
Ready to get started?
Design your project in 3 minutes and see a price estimate right away. Your enquiry goes straight to the owner, with a reply within 24 hours.
Offer ends in


